About this product
CPVC 724 is the adhesive solution the brochure specifies for sizes 65 mm (2½") and above, listed for 2½"-12" pipes in SCH40 and SCH80. It is supplied in 473 ml and 946 ml packs. A primer must be used for these sizes.
Key features
- For 2½"-12" pipes, SCH40 and SCH80
- To be used for sizes 65 mm (2½") and above
- Available in 473 ml and 946 ml packs
Applications
- Solvent-cement jointing of Astral CPVC PRO pipes and fittings of 65 mm (2½") and above (SCH40 / SCH80)
Specifications
Suitable Pipe Size: 2½" - 12" | Suitable Pipe Schedule: SCH40, SCH80 | Pack Sizes: 473 ml, 946 ml | Approx. Joints per Litre of Solvent Cement (by pipe size): 15 mm (½"): 1200; 20 mm (¾"): 750; 25 mm (1"): 500; 32 mm (1¼"): 450; 40 mm (1½"): 325; 50 mm (2"): 225; 65 mm (2½"): 50; 75 mm (3"): 40; 100 mm (4"): 30; 150 mm (6"): 10; 200 mm (8"): 5; 250 mm (10"): 2-4; 300 mm (12"): 1-2 | Cement Requirement: Solvent cements for Astral CPVC PRO systems must conform to ASTM F-493 or equivalent; a primer or cleaner must be used | Shelf Life: 2 years | Initial Set Time (15.5-37.7 °C): ½"-1¼" (15-32 mm): 15 min; 1½"-3" (40-80 mm): 30 min; 4"-8" (100-200 mm): 1 hr; 10"-12" (250-300 mm): 2 hrs | Initial Set Time (4.4-15.5 °C): ½"-1¼" (15-32 mm): 1 hr; 1½"-3" (40-80 mm): 2 hrs; 4"-8" (100-200 mm): 4 hrs; 10"-12" (250-300 mm): 8 hrs | Initial Cure Time (15.5-37.7 °C): ½"-1¼" (15-32 mm): 6 hrs; 1½"-3" (40-80 mm): 12 hrs; 4"-8" (100-200 mm): 24 hrs; 10"-12" (250-300 mm): 48 hrs | Initial Cure Time (4.4-15.5 °C): ½"-1¼" (15-32 mm): 12 hrs; 1½"-3" (40-80 mm): 24 hrs; 4"-8" (100-200 mm): 48 hrs; 10"-12" (250-300 mm): 96 hrs
Standards: ASTM F-493
Packing: 473 ml (master 12), 946 ml (master 12)