Skip to main content

About this product

Key features

  • Pre-applied: fixed before placing reinforcement and casting concrete
  • Post-applied: fixed after concrete has cured minimum 28 days
  • Can be applied on damp or green concrete
  • High flexibility and crack-bridging capabilities
  • No lateral water migration between concrete structure and membrane
  • Fully and permanently bonded to the reinforced concrete structure
  • Not affected if water table rises and falls
  • Resistant to aggressive conditions in natural ground water and soil
  • Selvedge on one side for self-adhered laps
  • Virgin (non-recycled) HDPE
  • Temporarily resistant to weathering and UV exposure during construction
  • VOC free, eco-friendly material
  • Sound anti-puncture performance

Applications

  • Damp-proofing, waterproofing and concrete protection for basements, subways, tunnels and other below ground concrete structures
  • Reinforced concrete base slabs
  • Reinforced concrete walls with single and double-faced formwork
  • Reinforced concrete footings and grade slab
  • Extension and reconstruction works
  • Prefabricated structures

Specifications

Chemical base: HDPE sheet membrane with adhesive layer, covered with release liner | Roll length: 20 m | Roll width: 1.2 m, 1.5 m, or 2.0 m | Selvage: 100 mm | Colour (HDPE side): White | Colour (adhesive side): Off white | Shelf life: 12 months from date of production | Storage temperature: +5 °C to +30 °C | Effective thickness HDPE film: > 0.9 mm | Effective thickness HDPE membrane composite: > 1.2 mm | Resistance to static puncture: 1000 ± 100 N (ASTM E154) | Tensile strength: ≥ 25 MPa (film) (ASTM D412 mod) | Elongation: 500 ± 25 % (ASTM D412 mod) | Joint peel resistance: 1500 ± 100 N/m (ASTM D1876) | Foldability at low temperature: Unaffected at -23 °C (ASTM D1970) | Water tightness: > 71 m of hydrostatic head (ASTM D5385 mod) | Adhesion in peel: 1000 ± 100 N/m after 7 days on concrete (ASTM D903 mod) | Water absorption: 0.5 % (ASTM D570) | Ambient and substrate temperature: +5 °C min. / +40 °C max. | Concrete placement window (pre-applied): within 21 days after installation | Data sheet edition: November 2025, Version 04.01 | Article ref: 020720301100000019

Standards: IS 16471 : 2017 (bonded sheet membrane)

Packing: Standard rolls wrapped individually in PE-foil

Request a Quote

Get bulk pricing directly from the supplier.

Login to Request Quote
WHY BUY HERE
GST verified supplier
PAN & GSTIN checked by BrickoMart
Site delivery available
Coordinated with the supplier
GST invoice on every order
Full input tax credit
Quality-checked dispatch
Sourced from verified suppliers

More like this

Comparable products from verified suppliers

SITE Set delivery location
Home